Question 12

Your customer runs two daily shifts in their plant: morning shift and evening shift. A resource, LATHE, is assigned to the work center W1. There are five units of LATHE available, of which three units are available for the morning shift and the remaining units for the evening shift.

Which two actions must the customer perform to associate LATHE with W1?

Options:

A.

Deselect the Available 24 Hours check box and, in the Resource Availability region, enter 40% against LATHE In the Evening Shift column.

B.

Deselect the Available 24 Hours check box and, in the Resource Availability region, enter ~z against LATHE in the Evening Shift column,

C.

Deselect the Available 24 Hours check box and, in the Resource Availability region, enter 3 against LATHE in the Morning Shift column.

D.

Select the Available 24 Hours check box and, in the Resource Availability region, enter 2 against LATHE in the Evening Shift column.

E.

Select the Available 24 Hours check box and, in the Resource Availability region, enter 3 against LATHE In the Morning Shift column.

F.

Deselect the Available 24 Hours check box and, in the Resource Availability region, enter 60% against LATHE in the Morning Shift column.

Question 13

Which three statements are true about executing rework work orders with manual control?

Options:

A.

You can perform operation completion only after the assembly has been issued to the work order, and only up to the quantity that the assembly component item Is issued to the work order.

B.

You can cancel the work order after releasing it and after performing any transactions.

C.

You must manually issue the assembly item to rework a work order, either partial or full quantity.

D.

You cannot cancel the work order after releasing it or after performing any transactions.

E.

If the group has grouping attributes, only work orders that match the grouping attribute values can be assigned to the groups.

Question 14

A Production Operator needs to load work order operation transactions from an external system into Manufacturing Cloud.

What is the correct sequence of tasks to achieve this?

Options:

A.

Export file to UCM server > Load data to data repository > Process import operations transactions > Load file from UCM to interface table.

B.

Load data to data repository > Load file from UCM to interface table > Export file to UCM server > Process import operations transactions.

C.

Load data to data repository > Export file to UCM server > Process import operations transactions > Load file from UCM to Interface table.

D.

Load data to data repository > Export file to UCM server > Load file from UCM to interface table > Process import operations transactions.

Question 15

Which is NOT a required setup task for Manufacturing master data?

Options:

A.

Manage Production Resources

B.

Manage Plant Parameters

C.

Manage Work Centers

D.

Manage Work Areas

E.

Manage Plant Profiles

Page: 3 / 3
Full Access Oracle 1z0-1075-24 Tutorials, Manufacturing Cloud 1z0-1075-24 Release Date,
Exam Code: 1z0-1075-24
Exam Name: Oracle Manufacturing Cloud 2024 Implementation Professional
Last Update: Dec 26, 2024
Questions: 50
1z0-1075-24 pdf

1z0-1075-24 PDF

$25.5  $84.99
1z0-1075-24 Engine

1z0-1075-24 Testing Engine

$28.5  $94.99
1z0-1075-24 PDF + Engine

1z0-1075-24 PDF + Testing Engine

$40.5  $134.99