What conclusion is most correct about the Experimental Design shown here with the response in the far right column?

Options:

A.

No factor has enough statistical confidence greater than 95% to have an impact on the response rate

B.

Constant, Adv and Bev are the only factors statistically affecting the response rate with 95% confidence or more

C.

If the Adv is increased from the low level to the high level, the response rate increases

D.

The response level is statistically concluded to only need the Adv and Bev factors set at the low level to get the largest response rate

E.

This design does not have enough experimental runs to conclude anything as evidenced by the lack of P-values in the MINITABTM output

Question 9

Kanban establishes a means of monitoring production, conveyance and delivery information such that efficient flow is established. The method used by Kanban is to require a _________ before anything moves.

Options:

A.

Sign-off

B.

Signal

C.

Bell to ring

D.

Work order

Question 10

A Belt working in a supply chain environment has to make a decision to change suppliers of critical raw materials for a new product upgrade. The purchasing manager is depending on the Belt’s effort requiring that the average cost of an internal critical raw material component be less than or equal to $4,200 in order to stay within budget. Using a sample of 35 first article components, a Mean of the new product upgrade price of $4,060, and a Standard Deviation of $98 was estimated. Select the answer that best states the Practical Problem.

Options:

A.

If the average cost per component is $4,200 or less, then the purchase manager will introduce the new product upgrade with new components.

B.

If the average cost per component is greater than $4,200, then the purchase manager will introduce the new product upgrade with new components.

C.

Only if the average cost per product upgrade is $4,060, will the purchase manager introduce new product upgrades with new components.

D.

If the average cost per new product upgrade is less than $180, then the purchase manager will introduce the new product upgrade with new components.

Question 11

Following process modifications, the Null Hypothesis states that no improvement to the process has occurred. If we discover the Null Hypothesis Test was rejected when it was false that would be a(n) ________________________.

Options:

A.

Alpha Error

B.

Type I Error

C.

Type II Error

D.

Type III Error

Page: 2 / 11
Exam Code: ICBB
Exam Name: IASSC Lean Six Sigma - Black Belt
Last Update: Nov 21, 2024
Questions: 300
ICBB pdf

ICBB PDF

$28  $80
ICBB Engine

ICBB Testing Engine

$33.25  $95
ICBB PDF + Engine

ICBB PDF + Testing Engine

$45.5  $130