Black Friday Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

LEED-AP-ID+C Leak Questions

Page: 5 / 7
Question 20

Best practices recommend that the LEED AP confirm that minimum program requirements have been met

Options:

A.

as part of the discovery phase

B.

as part of the final certification submittal

C.

after the design phase but before construction

D.

after the Commissioning (Cx) review but before design phase submittal

Question 21

A photovoltaic (PV) system was installed after commissioning (Cx) was completed on a 35,000 ft2 (3 252 m2) project. What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification?

Options:

A.

No action is necessary as the PV system is not required to be commissioned

B.

The PV system installer should commission their own installations and share the results with the project owner

C.

The building's electrical engineer should commission the installation and share the results with the project owner

D.

The Cx agent for the project must return and conduct or oversee the commissioning of the PV system

Question 22

A project team wants to achieve Materials and Resources Credit, Building Product Disclosure and

Optimization - Material Ingredients. By what means can a product demonstrate their material ingredient optimization?

Options:

A.

Green Seal

B.

Manufacturer Inventory

C.

GreenScreen v1.2 Benchmark

D.

Chemical Abstract Service Registration Number (CASRN)

Question 23

In the pre-design phase, a plumbing engineer identified that the low-flow fixtures which met the Owner's requirements could achieve total reductions in indoor water usage of 39%. Which strategies should be assessed to meet the Owner's Project Requirements goals of 45% reduction?

Options:

A.

Switching from municipally supplied potable water to potable well water on-site

B.

Reducing irrigation needs by planting native species and drought-tolerant species

C.

Reducing potable water supply by limiting occupant access to drinking fountains and public restrooms

D.

Reducing process water demand by assessing kitchen and laundry equipment selection and operational. schedules

Page: 5 / 7
Exam Code: LEED-AP-ID+C
Exam Name: LEED AP Interior Design + Construction (LEED AP ID+C) V4
Last Update: Nov 24, 2024
Questions: 100
LEED-AP-ID+C pdf

LEED-AP-ID+C PDF

$25.5  $84.99
LEED-AP-ID+C Engine

LEED-AP-ID+C Testing Engine

$28.5  $94.99
LEED-AP-ID+C PDF + Engine

LEED-AP-ID+C PDF + Testing Engine

$40.5  $134.99