Best practices recommend that the LEED AP confirm that minimum program requirements have been met
A photovoltaic (PV) system was installed after commissioning (Cx) was completed on a 35,000 ft2 (3 252 m2) project. What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification?
A project team wants to achieve Materials and Resources Credit, Building Product Disclosure and
Optimization - Material Ingredients. By what means can a product demonstrate their material ingredient optimization?
In the pre-design phase, a plumbing engineer identified that the low-flow fixtures which met the Owner's requirements could achieve total reductions in indoor water usage of 39%. Which strategies should be assessed to meet the Owner's Project Requirements goals of 45% reduction?