New Year Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

H13-629 VCE Exam Download

Page: 10 / 13
Question 40

In a Huawei disaster preparedness plan using production site deployment with an oracle RAC cluster, to ensure that the disaster recovery database provides normal service should the production site fail, which of the following statements is correct?

Options:

A.

Disaster recovery end must be deployed, oracle rac cluster can not deploy oracle single node.

B.

Oracle RAC grid production side of the file must be copied to the disaster recovery side.

C.

Unable to copy the production sideof the FRA file will be able to guarantee the normal provision of services at the northern end.

D.

Production end of the oracle data files and log files can not be placed in the same consistency group.

Question 41

A hospital bought a Huawei OceanStor 9000V100R001C30 storage device for storing business data. According to the relevant laws andregulations, which of the following descriptions of data loss prevention is wrong?:

Options:

A.

The engineer has set the WORM root directory according to the hospital's requirements, and all the subdirectories under this directory have the WORM attribute.

B.

During the file protection period, no one can delete the protected file.

C.

Protected Documents are Protected for a Period of 70 Years on Huawei OceanStor 9000 Storage Device.

D.

WORM log save root, quota and WORM protection period cannot be set.

Question 42

You want to partition a hard disk on a Windows Server 2008 R2 system, which of the following should you do?

Options:

A.

Create a 2TB NTFSvolume, the default sector (cluster) size is 8KB.

B.

Create a 30GB FAT32 volume, the default sector (cluster) size is 8KB.

C.

NTFS volumes can be set to the largest sector (cluster) to 512KB.

D.

The smallest sector (cluster) that an NTFS volume can set is4KB.

Question 43

Inorder to verify the consistency of the slave LUN data with the source data and to protect slave LUN data, which of the following descriptions is incorrect:

Options:

A.

Create a virtual snapshot of the slave LUN and activate it, then map the snapshot LUN to the host for authentication.

B.

After the snapshot LUN is mapped to the host, the host can read and write the snapshot LUN.

C.

After the verification is completed, stop the upper-layer service application, release the LUN mapping, and finally delete the snapshot.

D.

Stop the snapshot before the host can write snapshot LUN.

Page: 10 / 13
Exam Code: H13-629
Exam Name: HCIE-Storage (Written)
Last Update: Dec 22, 2024
Questions: 364
H13-629 pdf

H13-629 PDF

$25.5  $84.99
H13-629 Engine

H13-629 Testing Engine

$28.5  $94.99
H13-629 PDF + Engine

H13-629 PDF + Testing Engine

$40.5  $134.99