Winter Special Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: bigdisc65

H13-624 VCE Exam Download

Page: 24 / 27
Question 96

After testing, the bandwidth of the two data centers of the customer is 155Mbit/s, the peak write bandwidth of an application is 9.8MB/s, and the average

The write bandwidth is 300KB/s, the average write I/O size is 4KB., and the bandwidth utilization rate is 70%. Colleagues choose active and standby synchronous remote replication for disaster recovery

Scheme, the scheme:

Options:

A.

Not feasible, 200Mbit/s is required to calculate the bandwidth.

B.

Not feasible. The primary and standby synchronous remote replication disaster recovery solution requires that the bandwidth utilization rate must be >80%.

C.

Not feasible. The primary and standby synchronous remote replication disaster recovery solution requires that the write I/O size must be less than 2KB.

D.

Feasible, because the conditions meet the requirements of the primary and standby synchronous remote replication disaster recovery program.

Question 97

Send a control command through the backup server, first take a snapshot (or other similar operations) of the data volume that needs to be backed up,

Make a copy, then use the backup server to mount the snapshot volume, and use the backup server to back up the data on this volume to the backup

On the device. What type of backup networking is described in the above workflow?

Options:

A.

LAN-Base

B.

LAN-Free

C.

Server-Less

D.

Server-Free

Question 98

(multiple choice) OceanStor 9000 adopts Erasure code technology to protect data. If a site has 6 nodes, and the customer hopes that even if three disks are broken in one strip, the data can still be restored. The available redundancy protection levels are as follows:

Options:

A.

4+3:1

B.

6+3

C.

4+2

D.

12+3:1

Question 99

(multiple choice) The basic principles of daily maintenance of big data storage systems include:

Options:

A.

Develop a reliable backup plan

B.

Reserve spare parts on site for timely replacement in case of failure

C.

Use the resources and software provided by the original manufacturer

Page: 24 / 27
Exam Code: H13-624
Exam Name: HCIP-Storage V5.0
Last Update: Nov 21, 2024
Questions: 731
H13-624 pdf

H13-624 PDF

$28  $80
H13-624 Engine

H13-624 Testing Engine

$33.25  $95
H13-624 PDF + Engine

H13-624 PDF + Testing Engine

$45.5  $130