Free Access IASSC ICBB New Release

Page: 5 / 11
Question 20

With Measurement System Analysis we are concerned with two issues that impact the potential variability of the data. They are ____________ and Accuracy.

Options:

A.

Spread

B.

Reliability

C.

Precision

D.

Deflection

Question 21

A Lean Six Sigma project is attempting to reduce inventory days. The Process Capability will be monitored as part of the Control Phase to track the sustainability of the improvement.

Which distribution type is best used for performing the Capability Analysis?

Options:

A.

Weibull Distribution

B.

Normal Distribution

C.

Exponential Distribution

D.

Logistic Distribution

E.

Gaussian Distribution

Question 22

As a means of measuring the effects on other areas of a process as a result of changes in the primary metric we also define and track ________________.

Options:

A.

Parallel process metrics

B.

Secondary metrics

C.

Tertiary metrics

D.

Industry standards

Question 23

Following the completion of a LSS project the Belt not only creates a Control Plan he also develops a _____________ so those involved in the process know what to do when the critical metrics move out of spec.

Options:

A.

Response Plan

B.

Call List

C.

Chain-of-Command

D.

Defect Analysis Plan

Page: 5 / 11
Exam Code: ICBB
Exam Name: IASSC Lean Six Sigma - Black Belt
Last Update: Nov 21, 2024
Questions: 300
ICBB pdf

ICBB PDF

$28  $80
ICBB Engine

ICBB Testing Engine

$33.25  $95
ICBB PDF + Engine

ICBB PDF + Testing Engine

$45.5  $130