New Year Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

Financial Risk and Regulation 2016-FRR Full Course Free

Page: 9 / 25
Question 36

Which of the following statements represents a methodological difference between variance-covariance and full revaluation methods?

Options:

A.

Variance-covariance approach provides computational advantages over the full revaluation approach.

B.

Variance-covariance approach computes the VAR for each position separately, while the full revaluation method computes the VAR on a portfolio basis.

C.

Variance-covariance approach prices positions more accurately than the full revaluation approach.

D.

Variance-covariance approach uses only historic data to compute the covariance matrix.

Question 37

Alpha Bank, a small bank,has a long position with larger BetaBank and has an identical short position with another larger bank GammaBank. Each large bank requires a 20% initial collateral to support the trade. As prices fluctuate in either direction, one large bank will require additional collateral from the small bank, while the risk of loss to the other large bank will increase. By running the trades through a clearinghouse, the small bank can achieve all of the following objectives EXCEPT:

Options:

A.

Eliminating the collateral requirement

B.

Protecting itself against increases in future collateral demands

C.

Protecting against the risk of the failure of one of the large banks

D.

Mitigating option hedging risks and altering margin requirement

Question 38

Mega Bank has $100 million in deposits on which it pays 3% interest, and $20 million in equity on which it pays no interest. The loan portfolio of $120 million earns an average rate of 10%. If the rates remain the same, what is the net interest income of Mega Bank?

Options:

A.

$2 million per year

B.

$5 million per year

C.

$9 million per year

D.

$12 million per year

Question 39

Floating rate bonds typically have ________ duration which means they have ________ sensitivity to interest rate changes.

Options:

A.

long, small

B.

long, high

C.

short, high

D.

short, small

Page: 9 / 25
Exam Code: 2016-FRR
Exam Name: Financial Risk and Regulation (FRR) Series
Last Update: Dec 22, 2024
Questions: 342
2016-FRR pdf

2016-FRR PDF

$25.5  $84.99
2016-FRR Engine

2016-FRR Testing Engine

$28.5  $94.99
2016-FRR PDF + Engine

2016-FRR PDF + Testing Engine

$40.5  $134.99