Black Friday Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

All H35-260 Test Inside Huawei Questions

Page: 6 / 11
Question 24

The working mode of the port determines the flow control mode of the port. Which of the following flow control modes can be used when the operating mode is 100 Mbit/s full duplex

Options:

A.

Auto-negotiation flow control mode

B.

Non-auto-negotiation flow control mode

C.

Both of the above

D.

None of the above

Question 25

In the SDH system, we can use the instrument to test the input jitter tolerance of the STM-N interface. Which of the following instruments can complete this function?

Options:

A.

Smartbits

B.

SDH Analyzer

C.

Spectrum analyzer

D.

Bit Error Tester

Question 26

Which of the following does not belong to the multi-level connection monitoring mode of OTN

Options:

A.

Overlap Mode

B.

Cascading Mode

C.

Nested Mode

D.

Punch-Through Mode

Question 27

After the alarm inversion is set on the U2000, the alarm status of the board will also be changed accordingly, and the actual alarm status will no longer be indicated.

Options:

A.

True

B.

False

Page: 6 / 11
Exam Code: H35-260
Exam Name: HCSA-Field-Transmission & PTN V1.0
Last Update: Nov 24, 2024
Questions: 326
H35-260 pdf

H35-260 PDF

$25.5  $84.99
H35-260 Engine

H35-260 Testing Engine

$28.5  $94.99
H35-260 PDF + Engine

H35-260 PDF + Testing Engine

$40.5  $134.99