Weekend Special 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: Board70

D-PEXE-IN-A-00 Exam Dumps - EMC Servers Questions and Answers

Question # 4

What is the sequence of steps to install an XE9680 server in a new rack.

Options:

Buy Now
Question # 5

What must be considered regarding stab-in rails with installing a PowerEdge XE server?

Options:

A.

Enable a vertical installation of the server with the use of J-slots.

B.

Do not support extending the server from the rack.

C.

Only used in 4-post, square hole racks.

D.

Inner rail must be installed on the server before installing in rack.

Buy Now
Question # 6

A deployment engineer goes on-site to install a mix of XE systems in a customer testing and development data center. The customer engineering group is stress testing the PowerEdge XE servers to

determine the best XE server for their software applications. As one of the first steps, they must ensure the correct server rails are on-site.

Which three options are a correct matching of rail type with server type?

Options:

A.

XE9640 and B27

B.

XE9680 and B25

C.

XE9640 and B25

D.

XE8640 and B27

E.

XE9680 and B28

Buy Now
Question # 7

A deployment engineer is preparing to install three PowerEdge XE9680 servers in a rack supplied by the customer.

What must they before going on-site to install the servers?

Options:

A.

The rack can accommodate the length of the servers.

B.

The customer completed the required training on the server.

C.

The rack will have a top-of-rack switch.

D.

The rack has at least six PDUs and two power sources.

Buy Now
Exam Code: D-PEXE-IN-A-00
Exam Name: Dell PowerEdge XE9680 and XE8640 Install
Last Update: Feb 22, 2025
Questions: 14
D-PEXE-IN-A-00 pdf

D-PEXE-IN-A-00 PDF

$25.5  $84.99
D-PEXE-IN-A-00 Engine

D-PEXE-IN-A-00 Testing Engine

$28.5  $94.99
D-PEXE-IN-A-00 PDF + Engine

D-PEXE-IN-A-00 PDF + Testing Engine

$40.5  $134.99